How a project runs, from first conversation to final install

Marj Silva Interiors runs every project in five stages: an initial consultation, concept development, documentation and selections, design coordination during the build, and furniture and styling. The stages are tailored to your property and scope, so a single room may use three of them and a whole-home renovation all five. A typical project takes 3–6 months.

Overhead of stone, walnut timber and striped blue and white tile samples with a dried leaf and flowers
The studio sample table · Cremorne Point

How a project runs, from first conversation to final install

Marj Silva Interiors runs every project in five stages: an initial consultation, concept development, documentation and selections, design coordination during the build, and furniture and styling. The stages are tailored to your property and scope, so a single room may use three of them and a whole-home renovation all five. A typical project takes 3–6 months.

The five stages

What happens at each stage, what you get from it and what Marj needs from you.

  1. Marj Silva smiling in a white waistcoat against an olive textured wall
    01

    Initial consultation

    Marj learns about your home or business: how you live or work, your design preferences, the practical problems, your goals for the project and your budget. She looks at the rooms with you.

    You receive
    • A clear view of which services fit the project
    • A fee proposal within 3–5 days
    Your part
    Bring plans or rough measurements, photos, a budget band and pictures of rooms you like.
    Typical timing
    1.5-hour first consultation; fee proposal within 3–5 days
  2. Close view of a bronze bath and tap against glowing rose and amber Patagonia Borealis stone veining
    02

    Concept

    Layouts, a design direction, a colour palette and the main materials and finishes, explored together and presented as one idea, so you can judge the whole before anything is drawn in detail.

    You receive
    • Layout options where they matter
    • A colour and material palette, often as a sample board
    • The design direction for each room
    Your part
    Give honest feedback and make the big decisions: layout, direction, palette.
    Typical timing
    2–4 weeks
  3. Olive wall beside a timber bookcase with terracotta-red interior, marble bench and blue panelled doors
    03

    Documentation and selections

    Depending on the scope: floor plans, joinery drawings, material schedules, fixture selections and other documentation that communicate the design clearly to your builder and trades.

    You receive
    • Floor plans and joinery drawings
    • Material, fixture and finish schedules
    • Lighting and electrical plans where needed
    Your part
    Approve selections so the documents can be finalised and priced by your builder.
    Typical timing
    4–12 weeks
  4. Dark timber-veneer kitchenette with a backlit amber stone splashback and a curved bronze island
    04

    Coordination

    Design decisions during the build, liaison with builders, trades and consultants, and the relevant project requirements, as agreed for your project. Where a renovation needs a CDC or DA, Marj coordinates the design for that pathway; certification sits with your certifier or council.

    You receive
    • Answers to builder and trade questions on the design
    • Coordination with consultants as agreed
    • Help with decisions that come up on site
    Your part
    Engage the builder and any consultants; tell Marj when questions come up.
    Typical timing
    Runs with the build
  5. White living room with two curved cream sofas facing each other over a charcoal rug and herringbone oak floor
    05

    Furniture, styling and finishing

    Where it's part of the scope: furniture, lighting, artwork, rugs and accessories selected and sourced, then installed and styled in one go once every piece is on site, so the rooms feel finished when you move back in.

    You receive
    • Furniture, lighting and art selections
    • Procurement coordination
    • Installation and final styling
    Your part
    Approve the pieces and the budget for them.
    Typical timing
    1–2 consecutive days, once everything is on site

Scaled to your project

Not every project needs all five stages. This is what each kind of project usually includes.

Which stages each kind of project usually includes
ProjectConsultationConceptDocumentationCoordinationStyling
Colour scheme for a room or houseYesYesColour scheduleAs neededOptional
Kitchen or bathroomYesYesYesYesOptional
Custom joineryYesYesJoinery drawingsWith the joinerOptional
Moving houseYesFurniture planLayoutsNoOptional
Whole home or renovationYesYesYesYesYes

A guide to the usual scope of each project type; every project is tailored to your needs, property and project scope.

Approvals, and where Marj fits

Some renovations need approval before work starts: a complying development certificate (CDC) or a development application (DA). Marj Silva Interiors coordinates the design for whichever pathway applies and works with your certifier, council and consultants; the approval itself is issued by a registered certifier or the council.

Questions about the process

Timing, builders, single rooms and moving house.

  • Marj Silva Interiors works in five stages: an initial consultation, concept development, design documentation and selections, design coordination and implementation, and furniture, styling and finishing. Each project is tailored, so the scope of every stage depends on your property and what you have asked the studio to do.

    The five stages
  • Duration depends on scope: one room takes far less time than a whole home, and approvals, supplier lead times and how quickly selections are made all play a part. Design and documentation typically take 4–12 weeks with Marj Silva Interiors, and a whole project usually runs 3–6 months. Build time is set by your builder.

    How a project runs
  • A kitchen renovation has two parts: design and documentation, then the build. Kitchen design and documentation with Marj Silva Interiors typically take 6–8 weeks. The build depends on the cabinetmaker's lead time, stone fabrication and the trades, so ask your builder for a programme once the drawings are final.

    Kitchen design
  • A bathroom renovation has a design stage and a build stage. Bathroom design and documentation with Marj Silva Interiors typically take 4–8 weeks. The build depends on demolition, plumbing, waterproofing and curing times, tile and stone supply, and the trades, so your builder should give a programme from the drawings.

    Bathroom design
  • Before, ideally. A designer who starts early can settle the layout, joinery and finishes first, so your builder prices from complete drawings rather than guesses. That helps you make informed decisions early and avoid costly changes on site. If the builder is already chosen, bring them into the conversation early.

    How a project runs
  • Yes. Marj prepares the drawings and finish schedules your builder and trades work from, coordinates with them and with consultants, and answers design questions during construction. Marj Silva Interiors can work with the builder you have already chosen or recommend builders and trades suited to the project.

    Home renovation design
  • Yes. Marj Silva Interiors takes on everything from a single-room redesign to a complete home renovation. A kitchen, an ensuite, a wardrobe, a wall of joinery or a colour scheme can each be a project in its own right, and many clients return later to add more rooms.

    Custom joinery
  • Yes. Marj Silva Interiors measures and assesses the furniture you already own, works out what will fit, and develops a layout before moving day. You decide what to keep, replace or repurpose, and where custom joinery could help, so the new home feels settled from the first day.